Add an equipment SMU event
-
Click on the Equipment View button or select View | Equipment View from the menu.

-
Click the Add Event button or select the Edit | Add Event menu option.

- Accept the default Date/Time or specify the Date/Time of the event you are adding.
By default, the date/time will be 1 second after the event that is currently selected in the grid. If no event is currently selected, the default date/time will be 1 second after the shift start time. If the currently selected event's time is earlier than the shift start time (i.e. it is a Roll-over Events), this will be 1 second after the shift start time.
To set the Date/Time use the mouse to select the component of the date and time you want to change, then use the increment/decrement controls to change the selected component.
If the date and time you specify is invalid, the date/time will be set back to the default date/time.
- Select the Equipment you want to enter an SMU measure for. The Equipment list is restricted to those units of equipment that were active during the shift.
- Select Record SMU Measure against equipment as the Event you want to add.
- Select Data Elements from one or more drop-down lists. In the case of an SMU measure, you must specify a Measure Code and a Measure Value.
- Click the Add Event button to add the event and keep the dialog open. If you have finished adding SMU measures for equipment, click the Add and Close button.
To cancel (i.e. close the dialog without adding the event), click Close.