Validation
At a typical site, the following rules apply when editing events:
-
No status change can be inserted between dumps.
-
Truck dumps can only be inserted if the truck is assigned to a loader at the time of dumping.
-
Meter reading events, such as Litres Fuel, can only be inserted for equipment items that have been configured to record meter readings.
-
For secondary equipment that has not been allocated to primary equipment, no allocation event may be inserted. Secondary equipment can only be allocated to primary equipment as part of a status change event.
Validation errors will be reported when:
-
A cycle status has been entered against equipment that is not allocated to either a loader or location. Fix this by allocating the equipment to either a loader, or if using multiple loaders, a location, using an event time prior to this event.
- A loader is recorded as loading a truck but is not in an operating status.
- A material measure has been entered by the same equipment unit at both the source and the destination location. This may be an error. Check the location of the loader. Check the destination location. This may require editing the location of the loader or the destination of the hauling equipment.
- A material movement has been entered for an equipment unit that has a primary status which is not one of the operating states. Fix this by setting the equipment unit's primary status to an operating status at a time prior to this event.
- A measure value outside the minimum and maximum values has been entered.
- A measure value has been entered against an equipment unit which is not in an operating status.
These and other validation errors will be listed in the Event Validation pane.
If changes are made to events after a site-defined period has elapsed - typically 24 hours - the shift must be reprocessed.