Equipment Automatic Status Changes
This topic describes how to work with the following equipment status change types:
- An equipment unit has a measure entered against it.
For example, the last measure has been recorded for a drill and the status of the drill is set to Tramming or Shift Change.
- An equipment unit Is allocated to a location.
For example, when a loader is allocated to a loading location, its status is set to Operating.
- A status change to a primary unit triggers a status change for its associated secondary units
If the status of primary unit changes to Down, for example, the status of its associated secondary units will automatically change to Idle.
- A status change to a primary unit triggers a status change for unallocated secondary units in a selected active list.
If the status of primary unit changes to Down, for example, the status of unallocated secondary units at a predefined location will automatically change to Idle.
- An equipment unit is deallocated from a location.