Editing events

Where possible, the editing of data during a shift should be restricted to removing the last event (see: How do I undo the last event?). However, there will be cases when an event has been incorrectly recorded, or not recorded at all.

  • To modify equipment allocations, dump locations, equipment statuses and equipment measures, use the Pitram Event Editor to open the current or a previous shift event table.

The simplest case will be changing an incorrect value in the Number field, for example entering 800 metres drilled rather than 80.

Sometimes the Date and Time will be wrong. For example, if the Pitram operator becomes aware of a truck dump that occurred an hour ago.

  • One option is to use the Event Selector to record the truck dump during the current shift by setting a retrospective date and time. This function can also be used to insert events into the shift event table of a previous shift.

It is recommended that a backup copy be made of the shift database before editing.