Workflow

The most common workflow for the use of the Geology Toolkit is outlined in this section.

Geology Toolkit

Shift Start

Pitram Connect, being in network range, connects to the server and loads domain elemental grades. This step can be processed on demand from a button by the Geologist .

Note: This step must always be taken, otherwise the calculations in Pitram Connect will not be accurate.

Underground

  1. Geologist visually observes fragmentation of material at the location.

  2. Geologist visually observes volumes (%) for individual rock types at the location and enters them into Pitram Connect.

  3. Geologist selects the bucket type of equipment or an equipment model working at the location. This will determine the bucket factor used to calculate quantity.

  4. Geologist enters the number of buckets into Pitram Connect.

  5. Pitram Connect calculates grade from observations and loaded domain elemental grades.

  6. Pitram Connect calculates quantity (tonnes) from observed buckets using the bucket factor.

  7. Using the knowledge of the current cut-off values, geologist determines the material type and selects it in Pitram Connect.

  8. Geologist records a note against the spot observation.

  9. Geologist submits the location, fragmentation, material observations, selected material type, calculated grade, calculated tonnes and entered comment to the system.

Shift End

Geologist, being in the network range, will upload the recorded observations and calculated values from Pitram Connect to server.

Editing Data

Most commonly the user will edit material observations and buckets. The calculated grade will then adjust automatically. The imported elemental grades are not adjusted in Pitram Connect.

Observations can be entered into Pitram Connect while underground, and reviewed and edited before they are sent to the server.

Once recorded data is sent to the server, it is removed from display on the tablet. Any further editing is done directly in the server database. From a practical point of view, there are no live updates, everything is happening manually, on the user's demand.

Data Clean Up

Recorded data will be removed from Pitram Connect after it has been sent to the server. This usually happens at the end of the shift. After logging in, Pitram Connect ties a user to the date and shift. If the user does not log off, data is carried over.

For information on calculating grades, see Calculation of Grades.