VA11: P2P Events Summary Report - Carriers
VA11: P2P Events Summary Report - Carriers
| Description: |
|---|
| This report shows which carrier events are forwarded via peer-to-peer (P2P). |
| Associated panels: | |
|---|---|
| VA12: P2P Events Summary Report - Data Sources | This panel reports operators assigned to equipment where they do not have the required qualification. |
| Terms used: | |
| P2P | In Pitram, a two-way data transfer between equipment units and the server by means of data delivery. |
| Panel Definition: | |
|
A panel is defined by a set of report parameters and attributes which may vary from site to site: |
|
| Parameter | Attributes |
| Site | Select from the list of configured sites. |
| Period | Year, Month, Day Shift, Macro. |
| Equipment | The unit of equipment assigned as Secondary Unit. |
| Shift Roster | Select from the list of user defined shift rosters. |
| Summary levels: |
|---|
| The panel will report information for the selected Sites. |
| Data capture method: | ||
|---|---|---|
| Paper log | Voice radio | Automated network |
| Target audience: | ||||
|---|---|---|---|---|
| Management | Engineering | Geology | Survey | Maintenance |
| Personnel | Control Room Operator | Contractors | Drilling | Production |