| EH3: Equipment Hours by Period
|
A summary of the time selected equipment spent in selected states for a defined period. |
| EH1: Equipment Hours
|
A summary of the hours spent in each of the selected states by each of the selected pieces of equipment for the defined period. Run this report on a group of equipment (e.g. all bolters), to understand how their time is spent performing various tasks in the mine. |
| EH5: Equipment Timeline
|
A comprehensive report on the date, start time and duration that selected equipment was in one of the selected states during the defined period. |
| OID |
One or all of the operating, idle and down states. |
|
A panel is defined by a set of report parameters and attributes which may vary from site to site:
|
| Site |
Select from the list of configured sites. |
| Period |
Year, Month, Day Shift, Macro. |
| Equipment |
The unit of equipment assigned as Secondary Unit. |
| Source |
All Material, MineArea, Minelevel, Loctype, Dev/Prod, Material Type, Capital/Operating, Flowtype, Panel, Location. |
| Status |
All States, Group, Type, Category, Detail. |
| Shift Roster |
Select from the list of user defined shift rosters. |