Grade Control

On the Grade Control tab, in the Grade Control group:

  • Once your parcels and other grade control data have been loaded, select an option from the Setup menu.

    • If ore and waste parcels are defined by polygons, select Setup (Polygons) to estimate reserves for polygons representing dig lines.

    • When wireframes are generated as a result of the grade control calculation, select Setup (Wireframes) to estimate reserves for wireframes representing dig lines.